Case Studies

Recent Case Studies

Watch It Come Down Since 1929

Complete Demolition, Site Clearance & Recycling of Materials

For More Information about - Contact Us »

Kensington Church Street Posted on October 09, 2015

IMG_0923

Project: Kensington Church Street

Project Location: Kensington

Type of Demolition: Floor by Floor

Description of Project

The top down demolition of a 6 storey office block located on Kensington Church street using Brokk demolition machines. The building was made up of a concrete RC frame and a cavity wall brick infill.

Scope Of Works

  • Soft Strip
  • Temporary Works
  • Scaffolding
  • Top Down Demolition
  • Slab and Foundation Removal
This entry was posted in Case Studies. Bookmark the permalink.

Comments are closed.