Thames Water Posted on October 09, 2015

Beddington 013

Project: Beddington Digesters

Project Location: Beddington, Croydon, Surrey

Type of Demolition: Cold Cutting and Machine Demolition

Recycling Rate 100%

Description of Project

We were required to remove the roof of 3no digester tanks on Thames Water Beddington Sewage Treatment Works.

Hot cutting techniques were not permitted  because of the nature of the site which meant all three digesters had to be cold cut. Once the crown was cut the high reach could remove the sheets and demolish the umbrella structure.

Scope Of Works

  • Cold Cutting the crown
  • Removal of the Umbrella
  • Removal of the Walkway